BetterData Logo
Internal Operations: Construction & Infrastructure

Just-in-Time Jobsites: From Blueprint to Build

Eliminate the 20% budget overrun in your projects. Better Data synchronizes material delivery with real-time labor readiness and project milestones, ensuring the right materials are there exactly when the crew is ready.

The High Cost of
Disconnected Jobsites

Last-Mile Delivery Failures

Materials arriving before the site is ready create staging bottlenecks; arriving late stalls expensive labor crews.

Fragmented Subcontractor Data

Blind spots in labor readiness mean you're scheduling material drops for crews that haven't even cleared the previous phase.

Material Audit Gaps

Difficulty linking specific material costs to project codes and phases leads to hidden budget leakage and audit failures.

Jobsite Readiness Monitor
PHASE: L2-ELECTRICALSTALLED
Crew: SUB-CON-DELTAReady Status: 0% (Delayed)
Material Delivery: ARRIVED (IDLE)
Budget Leakage: +$2,400/day

The CCO Operating Loop for Construction

Bridge the gap between project management software and real-world jobsite reality. Synchronize your build.

Sense

Real-time jobsite material counts and labor punch-in/out statuses synced with geolocation markers.

Decide

Dynamic "Material-Ready" score for upcoming project phases based on actual previous phase completion.

Execute

Automated just-in-time (JIT) delivery scheduling and instant subcontractor notification via mobile.

Govern

Precision material audit trail linked to specific project phases and granular budget codes.

Improve

Supplier performance analysis to optimize delivery windows and reduce jobsite idle time cycles.

Pillar Applications

The core modules that power-transparent, timeline-locked construction operations.

JIT Logistics Orchestrator

Coordinate material arrival with micro-milestones to eliminate jobsite clutter and delivery idle time.

Subcontractor Sync Portal

Real-time visibility into subcontractor material usage and labor readiness to prevent phase collisions.

Project Ledger Bridge

Automatically link every material movement to a specific project phase and budget code for real-time costing.

Operational Success

Infrastructure

Just-in-Time Material

"Jobsite idle time reduced by 40% through synchronized asphalt and concrete delivery."

Better Data Implementation
Commercial Build

Budget Traceability

"Unaccounted project spend reduced by 15% via unit-level material-to-phase mapping."

Better Data Implementation
Residential Dev

Sub-Con Orchestration

"Phase transition delays reduced from 5 days to under 12 hours."

Better Data Implementation
-18%
Budget Variance
96%
Timeline Accuracy
+22%
Labor Productivity
-30%
Material Waste

Build with Precision Integrity

The age of fragmented jobsites is over. Join the firms building the future of transparent, efficient construction on Better Data.